#23.08.1 Buttonwillow Water System Improvements
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008101026
- Lead Agency
- Kern County
- Document Title
- #23.08.1 Buttonwillow Water System Improvements
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/24/2008
- Present Land Use
- Water storage and water well improvements/ Zoning: limited agriculture/ GP: public utility
- Document Description
- Design and construction of a 250,000-500,000 gal., domestic water storage tank, booster pump station, and connection to the Buttonwillow Co. Water Dist. water system. Federal Community Development Block Grant funds in the amount of $300,000 are allocated to construction of the water system improvements.
- Contact Information
-
Grace Coan
Kern County
2700 M Street, Suite 250
Bakersfield, CA 93301
Phone : (661) 862-5042
Location
- Coordinates
- 35°24'00"N 119°28'00"W
- Counties
- Kern
- Cross Streets
- Main Drain Canal and Miller Ave.
- Zip
- 93206
- Total Acres
- 1.32
- Parcel #
- 101-060-08
- State Highways
- 58
- Railways
- SPRR
- Schools
- Buttonwillow Union
- Waterways
- Main Drain Canal
- Township
- 29S
- Range
- 23E
- Section
- 14
- Base
- SBBMM
- Other Location Info
- City/Nearest Community: Buttonwillow
Notice of Determination
- Approving Agency
- Kern County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Kern Co. Clerk and Records Office 1115 Truxtun Ave. Bakersfield, CA 93301
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.