Modernization of Lincoln Alternative Elementary School
2 Documents in Project
Summary
SCH Number
2008101014
Lead Agency
Corona-Norco Unified School District
(CNUSD)
Document Title
Modernization of Lincoln Alternative Elementary School
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2008
Present Land Use
School/(S) School/Mixed Use
Document Description
Modernization of Lincoln Alternative Elementary School, which will include (1) construction of bell tower, plaza, covered walkway, asphalt hard-court, retaining wall, and trash enclosure; (2) installation of security fencing and electronic marquee sign; (3) conversion of three classrooms into Kindergarten classrooms with toilets and workroom; (4) relocation of shade structure to another location in the campus; (5) upgrade of restrooms; (6) extension, seal coating, and re-stripping of existing parking lot and adding lighting; (7) addition of two-story modular buildings which will consist of 14 classrooms, restrooms, teacher's workroom, library, and computer lab; (8) relocation of relocatable buildings for interim housing; and (9) removal of relocatable buildings.
Contact Information
Name
Lynne Murray
Agency Name
Corona-Norco Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Corona
Counties
Riverside
Cross Streets
Fullerton Ave. and Ford St.
Zip
92879
Parcel #
111-170-032
Waterways
Temescal Wash, unnamed lakes
Township
3S
Range
6W
Section
36
Base
SBBM
Notice of Determination
Approving Agency
Corona-Norco Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.