Mesquite Trails Specific Plan, Major Subdivision, and Major Use Permit for a Recreation Vehicle Park; SP 04-004; TM 5373RPL4; P04-023

Summary

SCH Number
2008099030
Lead Agency
San Diego County
Document Title
Mesquite Trails Specific Plan, Major Subdivision, and Major Use Permit for a Recreation Vehicle Park; SP 04-004; TM 5373RPL4; P04-023
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2008

Document Description
The project proposes to subdivide a 309.51 acre site in Borrego into four hundred and eighty (480) recreational vehicle lots, and twenty-eight (28) recreation or open space lots. The site is subject to the General Plan Regional Category (CT), Country Town and Land Use Designation (21), Specific Plan Area (1.55). The proposed project is zoned S-88, Specific Plan. There is one point of access to the project from Borrego Valley Rd. at the center of the project (and one emergency access road from Yaqui Pass Rd. located at the southernmost portion of the site). The Major Use Permit request is to establish a Recreational Vehicle development with on-site recreation facilities, landscaping features, perimeter and interior setbacks, and set forth a typical layout of the individual spaces.

Contact Information
Kim Sheredy
San Diego County
5201 Ruffin Road, Suite B
San Diego, CA 92123

Phone : (858) 694-8845

Location

Counties
San Diego

Notice of Determination

Approving Agency
San Diego County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
San Diego Co., Dept. of Planning and Land Use Project Processing Counter 5201 Ruffin Rd. Suite B San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes