Smith Lake and Mt. Elwell Trail Reroute

Summary

SCH Number
2008099005
Lead Agency
Eastern Plumas Recreation District
Document Title
Smith Lake and Mt. Elwell Trail Reroute
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2008
Document Description
The Beckwourth Ranger District has analyzed a proposal to reroute portions of the Smith Lake and Mt. Elwell Trails. This proposed project would move the Smith Lake Trail out of the riparian area and install one or two bridge crossings at Smith Creek east of Smith lake. It would also move the through trail around Smith Lake to the ridge on the north side of the lake. The reroutes for the Mt. Elwell Trail would include the construction and realignment of about a dozen switchbacks.

Contact Information

Name
Jennifer Lacy
Agency Name
Eastern Plumas Recreation District
Contact Types
Lead/Public Agency

Location

Counties
Plumas

Notice of Determination

Approving Agency
Eastern Plumas Recreation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print