Caples Lake Dam Outlet Emergency Repair Project

Summary

SCH Number
2008098067
Public Agency
Fish & Game #2
Document Title
Caples Lake Dam Outlet Emergency Repair Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/8/2008
Document Description
The purpose of the Caples Lake Outlet Emergency Repairs Project is to restore the safety and operational reliability of the malfunctioning reservoir regulating gates in the outlet system. The project consists of measures to replace the existing gates, gate frames, gate stems, gate wall guides, mechanical operators, complete concrete repairs, and replace the trash-rack. To accomplish the gate replacement project, it will be necessary to completely dewater the outlet system. This will require lowering the reservoir, installing a temporary coffer dam, and installing a flow bypass system.

Contact Information

Name
Amy Kennedy
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Other Location Info
Kirkwood

Notice of Exemption

Exempt Status
Emergency Project
Type, Section or Code
21080(b)(4); 15269(b)(c)
Reasons for Exemption
The EID found that the Caples Lake Dam Repairs constituted an emergency under the basis that the unseasonable high flows could pose risks to public safety and the environment and that the sudden loss of water would impede the EID's ability to provide adequate drinking water to its customers and to generate hydroelectric power for the California market.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.