Agreement 2008-0234-R4 - San Joaquin River Restoration Program Stream Gage Installation, Operation and Maintenance Project

4 Documents in Project

Summary

SCH Number
2008092116
Lead Agency
California Department of Water Resources (DWR)
Document Title
Agreement 2008-0234-R4 - San Joaquin River Restoration Program Stream Gage Installation, Operation and Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2009
Document Description
The CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, CA Dept. of Water Resources, San Joquin District. The Project consists of the rehabilitation of 2 existing water monitoring gage structures and the installation of 3 new water monitoring gages. Work will be conducted when the river is dry. Existing gages will have 4 inch diameter conduits extended between 30 to 45 ft into the low-flow channel of the river and will be anchored to the river bottom using concrete and steel. New gage installations will require excavation of a rectangular area ( 5ft x 5ft x 2 ft) to form concrete foundations. Upright standing culvert pipes will be anchpred to the poured concrete foundations using a crane to move and position the gage house. Sections of 4 inch pipe will be attached to the new gage house (via a 45-90 degree elbow) and placed above ground from the gage house down the side of the embankment and into the San Joaquin River. 2 to 3 anchors will be installed in the channel to keep the conduit containing the probes stable.

Contact Information

Name
John Battistoni
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Dos Palos
Counties
Fresno, Madera, Merced
State Highways
140
Waterways
San Joaquin River

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.