Addendum to the VVWRA's Westside Water Reclamation Plant, Phases III and IV Modifications and Expansion
5 Documents in Project
Summary
SCH Number
2008091098
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Addendum to the VVWRA's Westside Water Reclamation Plant, Phases III and IV Modifications and Expansion
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2010
Document Description
The project consists of replacement of the existing traveling filtration system with a cloth media filter to improve the filtrationprocess; replacement of the existing gaseous chlorine disinfection system with ultra violet disinfection to eliminate chlorine disinfection by-products in effluent; installation of a sodium hypochlorite facility to reduce bacterial growth in the effluent supplying the recycled water distribution system; installation of a digester gas scrubbing system including a ferric chloride addition system to allow digester gas to be used as fiel for the aeration blowers; and rebuilding the existing primary clarifiers to improve operating efficiency and mitigate nitrogen loading to the downstream treatment units.
Contact Information
Name
Michelle Lobo
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Victorville
Counties
San Bernardino
Cross Streets
Shay Rd.
Total Acres
~4
State Highways
Route66
Railways
BNSF Railway East/West Mail
Airports
Southern California Logistics
Waterways
Mojave River
Township
6N
Range
5W
Section
13
Base
SBM
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.