Westside Water Reclamation Plant, Phases III and IV Modifications and Expansion Project

5 Documents in Project

Summary

SCH Number
2008091098
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Westside Water Reclamation Plant, Phases III and IV Modifications and Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
11/24/2008
Present Land Use
Institutional
Document Description
The proposed project consists of the upgrade of the VVWRA Westside Water Reclamation Plant (WWRP) located at 20111 Shay Rd. in the City of Victorville, San Bernardino County, California. The WWRP provides treatment to the wastewater generated by the cities of Apple Valley, Hesperia, and Victorville, SCLA, and San Bernardino County Special Districts 42 and 64. The proposed WWRP Phase III and IV Modifications and Expansion and designed to increase the WWRP ultimate treatment capacity to 22 MGD, upgrade of the entire treatment process to produce effluent capable of meeting anticipated effluent discharge requirements, particularly for nitrates, increase production of Title 22 recycled water, improve solids handling, and increase biogas production. VVWRA will also consider constructing and operating an Industrial Wastewater Treatment Plant (IWTP) to pre-treat industrial effluent from a proposed industrial area at the Southern California Logistics Airport (SCLA).

Contact Information

Name
Logan Olds
Agency Name
Victor Valley Wastewater Reclamation Authority
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Cross Streets
Shay Rd.
Total Acres
~4
State Highways
Route66
Railways
BNSF Railway East/West Mail
Airports
Southern California Logistics
Waterways
Mojave River
Township
6N
Range
5W
Section
13
Base
SBM

Notice of Determination

Approving Agency
Victor Valley Wastewater Reclamation Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print