North Campus Housing Phase 2 Project

3 Documents in Project

Summary

SCH Number
2008091097
Lead Agency
University of California San Diego
Document Title
North Campus Housing Phase 2 Project
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2009
Document Description
The North Campus Housing Phase 2 project is an ~200,000 sf facility that will house ~800 students at UC San Diego. The housing component of the proposed project would construct five residential buildings over ~3.5 acres of the site, including on high-rise (13 story) and four mid-rise (4 story) buildings comprising student and staff apartments, vending, and laundry services; two low-rise non-residential buildings, including a bistro, administrative offices, and a self-serv market; various landscape and hardscape open space areas; a meeting garden and meeting plaza; and a service and emergency access road. In addition, two non-housing parking lots would be reconfigured and expanded on ~1.9 acres adjacent to the housing component of the project. The 5.4 acre project site is currently developed as a parking lot.

Contact Information

Name
Cathy Presmyk
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
Scholars Drive and North Point Drive
Zip
92093
Total Acres
5.4
Parcel #
342-010-18
State Highways
I-5
Airports
Torrey Pines Glideport
Schools
UCSD Preuss School
Waterways
Pacific Ocean; Pensaquitos Creek
Township
15S
Range
4W
Section
1
Base
Del Mar

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print