Revised Malibu Middle and High School Campus Improvement Project: Building E Replacement Option EIR Addendum

5 Documents in Project

Summary

SCH Number
2008091059
Lead Agency
Santa Monica-Malibu Unified School District
Document Title
Revised Malibu Middle and High School Campus Improvement Project: Building E Replacement Option EIR Addendum
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2017
Present Land Use
Institutional
Document Description
The Revised Project could result in the demolition of the existing 13,330 sq. ft. Building E and the construction of a two-story, 13,483-sf New Building E and associated ramp and hardscape. As an option to the original project's renovation of Building E into 12 classrooms and support space, Building E would be replaced with a 12-classroom building consisting of prefabricated modular classrooms and restrooms and conventional construction for the rest and would be a maximum of 25.5 feet high at the parapet. The New Building E would have a total of 10,392 sf of classroom space, with each classroom being 866 sf. Additionally, the New Building E would have two girls and two boys' restroom, totaling 810 sf, a 166-sft electrical room, a 211-sf elevator and machine room, 128-sf intermediate distribution frame (IDF) room, 61-sf custodian's closet, 304 sf of storage space, and 4,040 sf of covered canopy and exterior circulation. A stair well would be located on both ends of the New Building E, while an ADA compliant elevator would be located along the southeastern end of the New Building E. Mechanical heating, ventilation, and cooling equipment would be located along the southeastern end of the New Building E. The Revised Project includes limited improvements to the walkways and stairs from the existing Lower Parking Lot, landscaping around the New Building E, and limited utility improvements. Exterior lighting is minimized to on the courtyard and ramp sides that feature fixtures for the building that are within the ceilings and canopies and all exterior lighting utilizing 3000 Kelvin temperature LED fixtures. All above sq. footage number are approximate.

Contact Information

Name
Jan Maez
Agency Name
Santa Monica-Malibu Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Malibu
Counties
Los Angeles
Cross Streets
Morning View Drive and Merritt Drive
Zip
90265
Total Acres
23
Parcel #
various
State Highways
SR-1
Schools
Cabrillo ES
Waterways
Pacific Ocean, Zuma Creek

Notice of Determination

Approving Agency
Santa Monica-Malibu Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.