Antonio Minor Subdivision (3 Lots), Tentative Parcel Map, TPM 21030RPL, ER 06-14-036
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008091020
- Lead Agency
- San Diego County
- Document Title
- Antonio Minor Subdivision (3 Lots), Tentative Parcel Map, TPM 21030RPL, ER 06-14-036
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/10/2008
- Present Land Use
- Vacant/RS4, SIngle Family Residential/(5) Residential Land Use Designation
- Document Description
- The project is a Tentative Parcel Map to subdivide 1.4 acres into 3 residential lots, ranging in size from .24 acres net to .32 acres net. Access to the proposed lots will be provided by three private driveways from Los Coches Rd. Grading will consists of 170 cubic yards of excavation, 5,160 cubic yards of fill and 4,990 cubic yards of import. The project design includes the construction of retaining walls onsite, along the western and southern property lines. A wall will also be provided for fire protection purposes along the southern property line. The project site is subject to the (5) Residential Land Use Designations and RS4, Single Family Use Regulations, which require a min. net lot size of 10,000sf.
- Contact Information
-
Angel P. Antonio
San Diego County
5201 Ruffin Road, Suite B
San Diego, CA 92123
Phone : (858) 689-2259
Location
- Coordinates
- 32°50'26.7"N 116°54'53.3"W
- Counties
- San Diego
- Cross Streets
- Los Coches Road and Ha-Hana Road
- Zip
- 92040
- Total Acres
- 1.40
- Parcel #
- 397-060-81-00
- State Highways
- 67
- Railways
- No
- Airports
- No
- Schools
- Lakeside Union School District, Grossman HS District
- Waterways
- No
- Other Location Info
- Lakeside
Notice of Determination
- Approving Agency
- San Diego County
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- San Diego Co. Planning and Land Use Dept. 5201 Ruffin Rd., Suite B San Diego, Ca 92123
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.