ZV-701 and PM-1407

4 Documents in Project

Summary

SCH Number
2008091012
Lead Agency
City of Baldwin Park
Document Title
ZV-701 and PM-1407
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2009
Present Land Use
FC, Freeway Commercial, General Commercial
Document Description
San Gabriel Valley Water Company (San Gabriel) currently owns and operated the Plant B6 Water Treatment Facility (Plant). The Plant receives groundwater form four (4) extraction wells. The water produced from all four wells is contaminated from Volatile Organic Compounds (VOC's), Perchlorate, N-Nitrodimethylamine (NDMA) and 1-4 Dioxane, therefore the following has been installed at the Plant: air strippers for the removal of the VOC's, a regenerable resin ion exchange (ISEP) system to remove the Perchlorate, and a low pressure ultra violent light (LPUV) unit with hydrogen peroxide injection to remove the NDMA and 1-4 Dioxane. The existing ISP system generates a waste brine solution that contains Perchlorate, which is currently discharged. The installation of a single-pass ion exchange system has been confirmed as the best technology to replace the existing ISEP system. San Gabriel has purchased the single-family residential properties located directly across the street from the existing Plant. The existing single-family residential structures have been demolished and the proposed ion exchange equipment will be placed on these properties. To provide the additional storage required to operate the Plant, San Gabriel plans to construct a new 1.3 million gallon reservoir on the westerly portion of the proposed project area.

Contact Information

Name
Amy Harbin
Agency Name
City of Baldwin Park
Contact Types
Lead/Public Agency

Location

Cities
Baldwin Park
Counties
Los Angeles
Cross Streets
Big Dalton Avenue and Corak Street
Zip
91706
Total Acres
.5 (22,660)
Parcel #
8558-025-010,011,012
State Highways
I-10 & I-605
Railways
Metrolink
Airports
No
Waterways
Walnut Creek and Big Dalton Washes

Notice of Determination

Approving Agency
City of Baldwin
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print