Eastern Service Area Secondary Connection Project
3 Documents in Project
Summary
SCH Number
2008091003
Lead Agency
Padre Dam Municipal Water District
Document Title
Eastern Service Area Secondary Connection Project
Document Type
NOD - Notice of Determination
Received
Posted
4/5/2010
Document Description
The ESA Secondary Connection Project consists of a 2.5 million gallon potable water reservoir, a 13.5 MGD pump station and ~3,300 ft of 30 inch discharge pipeline.
Contact Information
Name
Sean Sterchi
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Intersate 8 and Lake Jennings Road
Zip
92021
Total Acres
2.5
Parcel #
398-140-16 and public right-of-way
State Highways
Interstate 8
Schools
Lakeview & Rios Elementary
Waterways
Los Coches Creek
Other Location Info
Lakeside
Other Information
Nearest City: Lakeside
Notice of Determination
Approving Agency
CDPH San Diego
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.