Regional Intertie Project - SAA 1600-2005-0041-R2

Summary

SCH Number
2008089002
Lead Agency
Butte County
Document Title
Regional Intertie Project - SAA 1600-2005-0041-R2
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2008
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0041-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Del Oro Water - Stacey Jolliffe 530-538-7601. This project pertains to Phase 1 of the Region Intertie Project. Authorized activities includes the modification of the existing lake intake and submersible pump to include twin 16-inch diameter intake structures and a skid mounted 125 horsepower submersible pump. A new 8-inch inlet pipe and casing will also be placed parallel to an existing pipe along the lake bottom for approximately 115 feet. The pipe will be assembled on shore, floated out to the lake via barge, filled with water and sunk to the lake bottom. Pre-cast concrete anchors placed at 10-foot intervals will secure the pipe in position. The new 8-inch pipe will be buried from the lake shore to an above ground manifold located in the marina approximately 24 feet from the lake shore. A 3-foot wide by 4-foot deep trench will be excavated using a backhoe. The pipe will be set in the trench and backfilled with native material. The project is located on the West Fork Feather River arm of Lake Oroville at the Lime Saddle Marina.

Contact Information

Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte
Other Location Info
Lake Oroville

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.