Napa River Rutherford Reach Restoration Project

8 Documents in Project

Summary

SCH Number
2008082086
Lead Agency
Napa County
Document Title
Napa River Rutherford Reach Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2008
Present Land Use
Undeveloped with adjacent vineyards Zoning: AP (Ag Preserve) General Plan: AR (Agricultural Resource)
Document Description
The purpose of the proposed project is to reduce existing bank erosion and associated inputs of fine sediments into the Napa River, and to enhance riparian and aquatic habitats within the reach to support native fish and wildlife. The project proposes to reduce existing bank erosion and enhance riparian and aquatic habitats by setting back existing earthen berms from the top of the river bank and creating vegetated buffers between the river and adjacent land uses, excavating and planting inset floodplain benches (1.5- to 2-year flood recurrence interval), removing non-native invasive species (e.g., Himalayan blackberry, periwinkle, giant reed, tree-of-heaven) and planting native understory species, installing biotechnical bank stabilization to stabilize actively eroding banks, and installing large woody debris structures and other features to improve aquatic habitat.

Contact Information

Name
Rick Thomasser
Agency Name
Napa County Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Cross Streets
Oakville Cross Road and Zinfandel Lane
Zip
94559
State Highways
128 and 29
Railways
Napa Valley Wine Train
Waterways
Napa River

Notice of Determination

Approving Agency
Napa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print