Conveyance Corridor Remedial Action Alternatives Report

14 Documents in Project

Summary

SCH Number
2008082066
Lead Agency
California Department of Parks and Recreation
Document Title
Conveyance Corridor Remedial Action Alternatives Report
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2023
Document Description
The project involves implementation of Alternative 4 of the Remedial Action Alternatives Report (RAAR). Project activities will involve the construction of an impermeable (lined) vegetated channel with the capacity to convey the 100-year peak flow event. The channel liner system would consist of an impermeable HDPE liner, geotextile separation layer, and cellular confinement system backfilled with imported soil. Areas of bare ground tailing and areas disturbed by construction beyond the limits of the lined channel would be covered with a 6-inch layer of imported growth medium and seeded while maintaining existing areas with ground cover or vegetative cover.

Contact Information

Name
Perry Myers
Agency Name
Department of Toxic Substances Control
Job Title
Supervising Hazardous Substances Engineer 1
Contact Types
Responsible Agency

Location

Cities
Grass Valley
Counties
Nevada
Regions
Citywide, Countywide, Northern California
Cross Streets
Empire Mine State Historic Park (Park) near Grass Valley
Other Location Info
10791 E. Empire Street
Other Information
Empire Mine State Historic Park

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/ or Department of Toxic Substances Control Office of Engineering and Special Projects 8800 Cal Center Drive Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.