Lake or Streambed Alteration Agreement No. 1600-2015-0286-R1

2 Documents in Project

Summary

SCH Number
2008082063
Lead Agency
City of Redding
Document Title
Lake or Streambed Alteration Agreement No. 1600-2015-0286-R1
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2015
Present Land Use
The project is undeveloped. Zoning is "RS-4" Residential Single Family District; General Plan designations include "Residential, 3.5 to 6 units per acre" and "Greenway."
Document Description
The Ausonio Subdivision Project consists of subdividing three existing parcels totaling 24.3 acres to create 48 lots for single-family residential developments. Public utilities (e.g., water, sewer, electric) currently about the project area and are available for extension to serve all lots. Mass grading is proposed to prepare most lots for home construction and to extend the public road system through the subdivision between the end of Auburn Drive and West Street. Grading would consist of approximately 29,000 cy of cut and 22,200 cy of fill, with a possible net export of 7,000 cy. Areas on lots with steep natural terrain of 20 percent slope that are not graded with the subdivision, along with avoided natural drainage features, would largely remain as open space.

Contact Information

Name
Adam McKannay
Agency Name
CDFW Northern Region
Contact Types
Lead/Public Agency

Location

Cities
Redding
Counties
Shasta
Cross Streets
Auburn Drive, Starlight Drive, West Street
Zip
96001
Total Acres
24.3
Parcel #
104-460-008, 104-460-011, 104-510-006
State Highways
I-5, SR 273, SR 299W
Railways
Union Pacific
Airports
Benton Airfield
Schools
Juniper and Cypress Elementary Schools
Waterways
Linden Creek, Sacramento River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print