Bay Division Pipelines 3 and 4 Crossover Facilities Project

3 Documents in Project

Summary

SCH Number
2008082050
Lead Agency
City and County of San Francisco
Document Title
Bay Division Pipelines 3 and 4 Crossover Facilities Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2008
Present Land Use
Guadalupe: Open Space/Pub. or Quasi-pub. Barron Crk: Major Inst./Special Facilities, Pub. Facilities Dist. Bear Gulch: Park and Open Space.
Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes to construct 3 crossover facilities: 1. Interconnect the SFPUC's Bay Division Pipelines 3 and 4; 2. Improve the reliability of the regional water system; and 3. Reduce vulnerability of the regional water system to damage in the event of a major earthquake. At each of the three proposed sites, the SFPUC would construct a concrete vault, pipes and valves, an emergency generator, a control panel, and assoc. utility connections. Crossover valves and connections would be constructed within concrete-lines vaults that would be approx. 61 by 35 ft. in area and 20 ft. deep. The vaults would be mostly subsurface but would extend approx. 4 ft. above the surface. An emergency generator, with an assoc. propane fuel tank, and communication equipment would be installed on two concrete pads adjacent to each vault. All three proposed sites are located in the SFPUC's right-of-way.

Contact Information

Name
Carrie Dovak
Agency Name
City and County of San Francisco
Contact Types
Lead/Public Agency

Location

Cities
Atherton, Palo Alto, Santa Clara
Counties
San Mateo, Santa Clara
Cross Streets
Lick Mill Blvd and Hope Drive/Loop Road and Miranda Avenue/Reservoir Road and Walsh Road
Total Acres
~ 3 (3 sites)
Parcel #
097-05-002, 142-17-033, 093-470-01
State Highways
101 and 280
Railways
South Pacific/Caltrain
Schools
25
Waterways
Guadalupe River/ Barron Creek/Atherton Channel

Notice of Determination

Approving Agency
City and County of San Francisco
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.