Water Storage Reservoirs (Tanks) and Pump Stations

3 Documents in Project

Summary

SCH Number
2008082015
Lead Agency
City of Turlock
Document Title
Water Storage Reservoirs (Tanks) and Pump Stations
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2008
Present Land Use
General Plan: Industrial; Zoning: Industrial (I).
Document Description
The project involves the construction of two identical water storage reservoirs (tanks) at two separate locations. Each reservoir is cylindrical in shape with a storage capacity of 1 million gallons. The facilities are an on-ground design with a maximum height of 34 feet and a diameter or 86 feet. The water storage tanks will occupy an approximately 25,500 square foot portion of each site. Both locations will also contain a 2,275 square foot, single-story pump house measuring 35 by 65 feet with a height of approximately 20.5 feet. The pump house provides security for the pump equipment and to attenuate any noise that may be generated from the pumping activities. The purpose of the projects is increase the reliability of the City of Turlock's potable water system and to add capacity to meet peak water demands.

Contact Information

Name
Michael Cooke
Agency Name
City of Turlock
Contact Types
Lead/Public Agency

Location

Cities
Turlock
Counties
Stanislaus
Cross Streets
SW: Kilroy / West Main; SE: Third and D Streets
Zip
95380
Total Acres
1.17
Parcel #
SW: 044009001 & SE: 043049055
State Highways
99
Railways
Union Pacific
Schools
John B. Allard

Notice of Determination

Approving Agency
City of Turlock
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A