City of McFarland Feasibility Study for the Garzoli Well; Public Water Syatem # 1510013

7 Documents in Project

Summary

SCH Number
2008081128
Lead Agency
City of McFarland
Document Title
City of McFarland Feasibility Study for the Garzoli Well; Public Water Syatem # 1510013
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2014
Present Land Use
Municipal Well Site/Exclusive Agriculture/Intensive Agriculture
Document Description
The project involves the construction of a well head arsenic treatment system to treat the existing Garzoli water well for arsenic removal. The project includes construction of concrete foundations, installation two FRP buildings for storage of sodium hypochlorite, ferric chloride, and sulfuric acid (separate), installation of six 10-ft diameter filter vessels, installation of a 96,000 gallon backwash storage tank and one 10 HP centrifugal booster pump for reclaimed supernatant water, installation of a 65,000 gallon backwash water supply storage tank and one 40 HP centrifugal booster pump for backwash water supply, modifications to the existing well discharge piping and installation of new piping, modifications to the existing site electrical and installation of new electrical and controls, and installation of 1,100 LF of 12" sewer PVC to convey backwash to sewer.

Contact Information

Name
Marlo Gonzales
Agency Name
City of McFarland
Contact Types
Lead/Public Agency

Location

Cities
McFarland
Counties
Kern
Cross Streets
Garzoli Avenue and Sherwood Avenue
Zip
93250
Total Acres
1
Parcel #
060-012-42
State Highways
Hwy 99
Schools
3 HS, Middle, & Elem.
Township
26
Range
25
Section
11
Base
MDB&M

Notice of Determination

Approving Agency
City of McFarland
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print