Rio Hondo Regional Public Safety Traning Center - Phase 3
2 Documents in Project
Summary
SCH Number
2008081094
Lead Agency
City of Santa Fe Springs
Document Title
Rio Hondo Regional Public Safety Traning Center - Phase 3
Document Type
NOD - Notice of Determination
Received
Posted
11/12/2008
Present Land Use
Zoning M-1 (Light Manufacturing)-Buffer Parking (BP) Overlay District / M-2 (Heavy Manufacturing) BP Overlay District General Plan, Industrial
Document Description
The Rio Hondo Regional Public Safety Training Center - Phase 3 is a proposed fire training facility in an existing industrial area. The facility would be composed of primarily asphalt concrete pavement with concrete (Initial Study, Figure 2- Local Vicinity) and gravel areas located on the north and south property lines lot. The eastern portion of the property, along Shoemaker Ave, has existing landscaping (Initial Study, Figure 3, Plot Plan).
The Rio Hondo Regional Public Safety Training Center - Phase 3 would contain props that are in two main categories: Hazardous Materials training props and Urban Search and Rescue training props. No hazardous materials or chemicals will be used in any of these props. Some of the hazardous materials props will be plumbed with compressed air lines and water to stimulate leaking equipment to provide safe yet realistic training to trainees.
Contact Information
Name
Wayne Morrell
Agency Name
City of Santa Fe Springs
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Fe Springs
Counties
Los Angeles
Cross Streets
Shoemaker Avenue/Lakeland Road
Zip
90670
Parcel #
8026-018-027
State Highways
I-605, I-5
Railways
2 (Southern Pacific,BNSF)
Schools
24
Township
3
Range
11
Section
8
Notice of Determination
Approving Agency
City of Santa Fe Springs
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.