Del Mar Fairgrounds Sewer Forcemain Replacement Project

5 Documents in Project

Summary

SCH Number
2008081034
Lead Agency
22nd District Agricultural Association, Del Mar Fairgrounds (22nd DAA)
Document Title
Del Mar Fairgrounds Sewer Forcemain Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2009
Document Description
The Del Mar Sewer Forcemain Replacement Project includes the replacement of an existing sewer forcemain between the DAA and the City of Del Mar Public Works Facility with a parallel 8 inch diameter HDPE pipe encased within a larger 16 inch HDPE sleeve. The project will utilize the HDD Method that involves drilling a bore ~500 feet in length and 25 ft, or deeper, beneath the bottom of the Dan Dieguito Lagoon channel. The new forcemain will be located ~500 ft to the east of the existing forcemain which will be flushed with clean water and capped to be abandoned in place. (SAA# 1600-2008-0290-R5)

Contact Information

Name
Rebecca Bartling
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Del Mar
Counties
San Diego
Cross Streets
Jimmy Durante Boulevard/Via de la Valle
Zip
92014
Total Acres
0.50
State Highways
I-5
Railways
Amtrak/NCTD
Schools
Del Mar Hills Academy
Waterways
San Dieguito River/Stevens Creek
Township
14S
Range
4W
Section
2

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print