Del Mar Fairgrounds Sewer Forcemain Replacement Project

5 Documents in Project

Summary

SCH Number
2008081034
Lead Agency
22nd District Agricultural Association, Del Mar Fairgrounds (22nd DAA)
Document Title
Del Mar Fairgrounds Sewer Forcemain Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2008
Present Land Use
Southern Project Area; City of Del Mar - Floodway Northern Project Area; State of California - 22nd DAA
Document Description
The proposed project entails the replacement of an existing approximately 35-year old pipeline with a new forcemain pipeline under the San Dieguito River. The new pipeline would have the same carrying diameter as the existing pipeline (eight-inch) and would not increase wastewater flows beyond the amounts agreed upon by the 22nd DAA and the City of Del Mar. The peak flow would remain constant at 630 gallons per minute (gpm). As discussed in Section 1, the 22nd DAA anticipates the need to increase the peak flow in the future based upon the projects proposed in the on-going Master Plan. However, no increase in peak flow is proposed at this time. Environmental review associated with the potential increase in peak flows will be included in the EIR being prepared for the Master Plan. The proposed project would not result in an increase in pipeline pressure nor would it require modifications to the existing pump station. Similarly, infrastructure for receiving the forcemain located within the City of Del Mar's Public Works yard would not need to be modified.

Contact Information

Name
Rebecca Bartling
Agency Name
22nd District Agricultural Association
Contact Types
Lead/Public Agency

Location

Cities
Del Mar
Counties
San Diego
Cross Streets
Jimmy Durante Boulevard/Via de la Valle
Zip
92014
Total Acres
0.50
State Highways
I-5
Railways
Amtrak/NCTD
Schools
Del Mar Hills Academy
Waterways
San Dieguito River/Stevens Creek
Township
14S
Range
4W
Section
2

Notice of Determination

Approving Agency
22nd District Agricutural Association
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.