Moye Winery Project; Conditional Use Permit (U 2007-12) and Design Review (DR 2007-14)

2 Documents in Project

Summary

SCH Number
2008072089
Lead Agency
City of Calistoga
Document Title
Moye Winery Project; Conditional Use Permit (U 2007-12) and Design Review (DR 2007-14)
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2008
Present Land Use
General Plan: Rural Residential Zoning: "RR," Rural Residential
Document Description
The Applicant's, Matthew and Adrian Moye, propose to develop a large scale winery, as defined per 17.14.020(B)(9) CMC, with an annual production of up to 4,000 cases of wine on the property. The proposed 2-story winery structure will be located behind the existing residence toward the southeast. The structure will be approximately 4,714 square feet in size and approximately 23', 6" in height, as measured from the average natural grade to the midpoint of the roof. The 2,072 square foot ground floor will consist of barrel storage and production facilities, bathrooms, lab/office and a kitchen. An approximately 1,367 square feet covered tank pad and/or crush pad will be developed off of the ground floor. The second story is approximately 1,275 square feet in size and contains office space and the tasting room. The structure will be built using conventional wood frame construction with siding and insulation for temperature control. The structure will be painted consistent with the residence. The crush pad will accommodate a crusher, press and fermentation tanks and other winery equipment as necessary.

Contact Information

Name
Erik V. Lundquist
Agency Name
City of Calistoga
Contact Types
Lead/Public Agency

Location

Cities
Calistoga
Counties
Napa
Cross Streets
2280 Greenwood Avenue
Zip
94515
Total Acres
18
Parcel #
011-351-017
Airports
Defunct Gliderport
Schools
Calistoga Elementary, Middle, and High Schools
Waterways
Napa River
Township
9N
Range
7W

Notice of Determination

Approving Agency
City of Calistoga
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes