Auburn Raw Water Supply Pipeline Project

2 Documents in Project

Summary

SCH Number
2008072057
Lead Agency
Placer County Water Agency
Document Title
Auburn Raw Water Supply Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2008
Present Land Use
Highway Services and Designed Scenic Corridor (HS-Dc)
Document Description
The proposed project would consist of the replacement of 30-inch diameter steel pipeline with a 36-inch diameter pipeline, which supplies water to the Auburn WTP. Two alternatives have been analyzed. Alternative 1 would consist of approximately 2,540-feet of 36-inch diameter pipeline; 130-feet of 48-inch pipeline for the tie-ins at the Sizzler box; 1,500-feet of 6-inch service lateral; and 70-feet of 3-inch service lateral. Alternative 2 would consist of approximately 2,690-feet of 36-inch diameter pipeline; 130-feet of 48-inch pipeline for the tie-ins at the Sizzler box; 1,500-feet of 6-inch service lateral; and 70-feet of 3-inch service lateral. At this time, Alternative 1 is the preferred alignment.

Contact Information

Name
Heather Trejo
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Placer
Cross Streets
within Lincoln Wy from intersect with Foresthill Road to N of intersect with Sylvan Vista Drive
Zip
95603
Total Acres
0.5
State Highways
I-80
Railways
UPPR
Schools
Bowman Elementary School
Township
12N
Range
8E
Section
2
Base
MDB&M

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No