Black Butte Drive/Shastina Drive Realignment Project

3 Documents in Project

Summary

SCH Number
2008072034
Lead Agency
City of Weed
Document Title
Black Butte Drive/Shastina Drive Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2008
Document Description
The City of Weed is proposing to utilize State Transportation Improvement Program (STIP) funding to realign portions of Black Butte Drive and Shastina Drive. These improvements are proposed in order to improve circulation in the South Weed area. In order to accomplish this, Black Butte Drive would be realigned so that it, rather than Shastina Drive, provides for continuous vehicle movement en route to South Weed Boulevard to the north. Shastina Drive would similarly be realigned so that it terminates in a "T" intersection with Black Butte Drive approximately 40 feet north of the current Shastina Drive/Black Butte Drive intersection. In essence, the functional orientation of these two roadways would be reversed. In conjunction with the proposed realignment of Black Butte Drive, the segment of Black Butte Drive between Vista Drive and Shastina Drive would be widened to accommodate the resulting increase in traffic. Lastly, the Black Butte Drive/Vista Drive intersection would eventually be signalized and existing depressions at the intersection filled.

Contact Information

Name
Earl Wilson
Agency Name
City of Weed
Contact Types
Lead/Public Agency

Location

Cities
Weed
Counties
Siskiyou
Cross Streets
Vista Drive, Black Butte Drive, and Shastina Drive
Zip
96094
Total Acres
~ 4
Parcel #
060-551-680
State Highways
I-5 and SR 97
Railways
Union Pacific Railroad
Schools
Weed ES & HS, Wyeka Vista Community Day, College of Siskiyous
Waterways
Boles Creek
Township
41
Range
5W
Section
13

Notice of Determination

Approving Agency
City of Weed
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print