Interstate 80 Bicycle/Pedestrian Bridge Project (HC21/K150020000)
3 Documents in Project
Summary
SCH Number
2008072005
Lead Agency
City of Sacramento
Document Title
Interstate 80 Bicycle/Pedestrian Bridge Project (HC21/K150020000)
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2008
Present Land Use
The present use of the site is a mixture of drainage canal and adjacent vacant land, freeway, and agricultural and parkland. Zoning consists of Single and Multi-family residential, office, flood zone, and agricultural and open space. General Plan designations include: Low and Medium Density Residential, Regional Commercial and Offices, Parks and Recreation and Open Space, and Water.
Document Description
The City of Sacramento proposed to construct a pedestrian/bicycle overcrossing (POC) over Interstate 80 adjacent to the Natomas Main Drainage Canal where the Natomas West and Natomas East Drainage canals merge. The City also proposes to construct an at-grade level bridge (Canal Bridge) across the West Drainage Canal to link the north end of the POC with the existing trail. The project will also consist of all railings and fencing, grading, paving and slope protection, signage, and lighting associated with the POC. The POC will consist of a cast-in-place box girder section, supported by two east-in-place concrete abutments and five cast-in-place concrete columns on driven piles. The Canal Bridge will include a pre-manufactured steel truss "flat slab" structure this unit will consist of weathering steel, concrete deck, and smooth steel handrails; it will be designed to be removable as needed by the Reclamation District 1000 for maintenance of the Canal. Concrete will also line the canal bottom under the bridge and 10 feet beyond in both directions.
Contact Information
Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Interstate 80 and Interstate 5 (I-80 Post Mile 2.10 approximately 1/3 mile west of I-5)
Zip
95833
Total Acres
2.0 +/-
Parcel #
parts of 225-0022-070, -078, -079, -092, -097, -099
State Highways
I-80, I-5
Waterways
Natomas West, East, and Main Drainage Canals, Sacramento River
Notice of Determination
Approving Agency
City of Sacramento, City Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.