Mitigated Negative Declaration No. 08-010 (Huntington Harbour Bulkhead Repair Project)
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008071142
- Lead Agency
- Huntington Beach, City of (City of Huntington Beach)
- Document Title
- Mitigated Negative Declaration No. 08-010 (Huntington Harbour Bulkhead Repair Project)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/30/2010
- Document Description
- The purpose of the project is to restore the foundation of the bulkhead and provide toe protection to inhibit any future scouring or erosion, which may jeopardize the bulkhead's structural integrity. The repair project would consists of three phases: pile repair, placement of sheet piles and installation of slope protection, although not all phases would apply to all properties. File Ref: WP 3164.1
- Contact Information
-
Paul D. Thayer
California State Lands Commission
100 Howe Ave, Suite 100-South
Sacramento, CA 95825-8202
Phone : (916) 574-1800
Location
- Coordinates
- 33°43'17"N 118°3'53"W
- Cities
- Huntington Beach
- Counties
- Orange
- Cross Streets
- Edinger Avenue and Pacific Coast Highway
- Zip
- 92649
- Total Acres
- < 1
- Parcel #
- 30 parcels
- State Highways
- 1 (Pacific Coast Highway)
- Schools
- Harbor View Elementary School
- Waterways
- Huntington Harbour, Anaheim Bay
Notice of Determination
- Approving Agency
- California State Lands Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- City of Huntington Beach 2000 Main Street, 3rd Floor Huntington Beach, CA 92648
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.