Huntington Harbour Bulkhead Repair Project

6 Documents in Project

Summary

SCH Number
2008071142
Lead Agency
City of Huntington Beach
Document Title
Huntington Harbour Bulkhead Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2008
Present Land Use
Huntington Harbour is a man-made residential marina complex that was dredged out of mudflats and developed in the 1960s. Zoning: RL-CZ (Residential Low Density - Coastal Zone) General Plan: Residential Low Density
Document Description
The purpose of the project is to restore the foundation of the bulkhead at 30 existing single-family residential properties in Huntington Harbour and provide toe protection to inhibit any future scouring or erosion, which may jeopardize the bulkhead's structural integrity. The bulkheads in Huntington Harbour are made of reinforced cast-in-place concrete and untreated timber piles supporting the footings. Due to the time span of design and construction, there are slight differences in bulkhead design among the properties. Some sections of the bulkhead have a cutoff wall below the bulkhead and some do not have a cutoff wall. Over the years, erosion due to localized tidal currents, recreational boat use and periodic maintenance dredging activities in the area have undermined the bulkhead, damaged the support piles and threatened the overall structural integrity. Properties located on the main channel show the greatest erosion levels.

Contact Information

Name
Jennifer Villasenor
Agency Name
City of Huntington Beach
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Edinger Avenue and Pacific Coast Highway
Zip
92649
Total Acres
< 1
Parcel #
30 parcels
State Highways
1 (Pacific Coast Highway)
Schools
Harbor View Elementary School
Waterways
Huntington Harbour, Anaheim Bay

Notice of Determination

Approving Agency
City of Huntington Beach Zoning Administrator
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes