Quail Valley Water District Water System Consolidation

3 Documents in Project

Summary

SCH Number
2008071137
Lead Agency
Quail Valley Water District
Document Title
Quail Valley Water District Water System Consolidation
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2008
Present Land Use
General Plan designation: Residential Zoning Designation: MH, RS

Document Description
The proposed project is the consolidation of Quail Valley Water District's Eastside and Westside Water Systems by installing approximately 6,000 linear feet of 4-inch diameter pipe in the existing road right of way to convey potable water. The Eastside Water System will be taken out of service, as recent water quality analysis show that it exceeds the State and Federal drinking water standards for arsenic of 10 ppb. The consolidation will result in the community's drinking water being below the Arsenic MCL of 10 ppb. New transmission lines will be installed to connect the Eastside System's above ground storage tanks to the Westside System to maintain fire protection and emergency water supply.

Contact Information
Elana Bonaventura
Quail Valley Water District
3200 21st Street, Suite 401
Bakersfield, CA 93301

Phone : (661) 322-4027

Location

Coordinates
35°10'22.0"N 118°20'09.6"W
Counties
Kern
Cross Streets
Sand Canyon Road / Umtali Road
Zip
93561
Other Location Info
City/Nearest Community: Quail Valley

Notice of Determination

Approving Agency
Quail Valley Water District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Quail Valley Water District 3200 21st Street, Suite 401 Bakersfield, CA 93301

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.