Former Long Beach Naval Complex Installation Restoration Site 7 Dredging Project - HDP 08-014

2 Documents in Project

Summary

SCH Number
2008071080
Lead Agency
Long Beach, Port of (Port of Long Beach)
Document Title
Former Long Beach Naval Complex Installation Restoration Site 7 Dredging Project - HDP 08-014
Document Type
NOD - Notice of Determination
Received
Posted
10/18/2008
Present Land Use
Port Master Plan / Industrial

Document Description
The Port of Long Beach is proposing to dredge up to approximately 800,000 cubic yards of contaminated sediments from within 700 acres at Installation Restoration Site 7 in the West Basin and place that material in an approved fill site at Pier G within the Harbor District. In addition, an existing, abandoned sonar calibration pier and four sunken barges would be removed, abated, and dismantled.

Contact Information
Stacy Crouch
Long Beach Harbor Department Board of Harbor Commissioners
925 Harbor Plaza
Long Beach, CA 90802

Phone : (562) 590-4160

Location

Coordinates
33°44'"N 118°13'"W
Cities
Long Beach
Counties
Los Angeles
Cross Streets
Pier T Avenue and Navy Mole Road
Zip
90802
Total Acres
700
State Highways
I-710, SR-47, SR-103
Waterways
San Pedro Bay

Notice of Determination

Approving Agency
Long Beach Harbor Department Board of Harbor Commissioners
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search