Robertson's Ready Mix and Santa Rosa Developers
2 Documents in Project
Summary
SCH Number
2008071071
Lead Agency
City of Moreno Valley
Document Title
Robertson's Ready Mix and Santa Rosa Developers
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2008
Present Land Use
General Plan: Business Park/Industrial
Zoning: Industrial with Air Installation Compatible Use Overlay Zone
Document Description
The proposed project involves two components. The first is a batch plant for manufacture of ready mix concrete. The batch plant is a replacement for the existing Robertson's batch plant on Day Street in the City of Moreno Valley and proposes both central mixer (wet) and traditional transit-mix (dry) plants. Proposed batch plant site improvements include silos, a central mixer, aggregate bins, conveyors, a two-story office building, an underground diesel storage tank, on-site circulation and parking, and a detention/infiltration basin. A three-sided concrete tilt-up structure resembling nearby warehouse buildings will contain on-site aggregate and sand storage.
The self-storage facility proposes approximately 690 units in seven, one and two story buildings (approximately 99,000 square feet total building area) with an office and caretaker's residence. This aspect of the proposed project is designed as an integral aspect of the overall site design, and is intended to screen the batch plant.
Contact Information
Name
Kathleen Dale
Agency Name
City of Moreno Valley
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Moreno Valley
Counties
Riverside
Cross Streets
Old 215 Frontage Road between Alessandro Boulevard and Cactus Avenue
Zip
92553
Total Acres
5.82
Parcel #
297-100-007 (portion)
State Highways
I-215
Railways
BNSF
Airports
March ARB, Inland Cargo Port
Schools
Moreno Valley USD
Waterways
Sycamore Canyon Creek
Township
3S
Range
4W
Section
16
Base
SBB&M
Notice of Determination
Approving Agency
CIty of Moreno Valley
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No