I-405/Avalon Interchange Improvements Project

3 Documents in Project

Summary

SCH Number
2008071064
Lead Agency
Caltrans 7 (Los Angeles) (California Department of Transportation, District 7)
Document Title
I-405/Avalon Interchange Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2009

Document Description
The propsed project would improve the configuration of the existing interchange of Avalon Blvd at I-405. The interchange would be redesigned to link the site of the Carson Marketplace project to the project to the intersection at Avalon Blvd by extending Lenardo Drive to Avalon Blvd. The existing southbound ramps lying between the Carson Marketplace site and Avalon Blvd would be realigned and a new southbound ramp would be provided east of Avalon Blvd. In addition, the northbound on and off-ramps would be improved.

Contact Information
Eduardo Aguilar
California Department of Transportation, District 7
100 South Main Street
Los Angeles, CA 90012-3712

Phone : (213) 897-3656

Location

Coordinates
33°50'20.71"N 118°15'48.84"W
Cities
Carson
Counties
Los Angeles
Cross Streets
I-405/Avalon Boulevard and I-405/213th Street between Del Amo Boulevard and Carson Street
Zip
90745
State Highways
I-405 and I-110
Airports
Blimp Station
Schools
Annalee Avenue Elementary School
Waterways
Dominquez Channel: Torrance Lateral

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Caltrans 100 South Main Street Los Angeles, CA 90012-3712

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print