Proposed Sunnyslope Reservoir Improvement Project

3 Documents in Project

Summary

SCH Number
2008071061
Lead Agency
Jurupa Community Services District
Document Title
Proposed Sunnyslope Reservoir Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2008
Present Land Use
The proposed project location is within the Jurupa Area Plan (JAP) of the Riverside County Integrated Project General Plan (RCIP GP). The designated land use in the JAP for the project site and adjacent area site is Low Density Residential RC (LDR-RC) and Open Space Rural (OS-RUR). The majority project site is currently vacant land with an existing 3.2 million gallon reservoir located in the southern extent. Zoning: A-1 (Light Agriculture) and W-2 (Controlled Development Areas).
Document Description
The project includes the construction of one new partially buried pre-stressed concrete tank with a proposed nominal diameter of ranging from 200 to 230 feet and a nominal shell height of 42 feet (including freeboard), totaling 10 to 13 million gallons (MG) of storage. A second tank with 6 to 10 MG of storage will be constructed at a future date to replace the existing 3.2 MG Sunnyslope tank. The project also includes approximately 2,500 linear feet of stormdrain pipeline, paving, and fencing improvements.

Contact Information

Name
Eldon Horst
Agency Name
Jurupa Community Services District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Northwest of the intersection at Granite Hill Drive and Soto Street
Zip
92509
Total Acres
2.5
Parcel #
174-030-026 and 174-150-019
State Highways
SR 60
Railways
Union Pacific Railroad
Schools
Jurupa Unified School District
Township
2S
Range
5W
Section
6, 7
Base
SBB&M
Other Location Info
City/Nearest Community: Sunnyslope / Rubidoux

Notice of Determination

Approving Agency
Jurupa Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print