Site and Architectural Review 07-12/Grand Terrace Town Square Master Development Plan (TSMDP), Master Development Sign Program 09-01, Site and Architectural Rev
5 Documents in Project
Summary
SCH Number
2008071017
Lead Agency
City of Grand Terrace
Document Title
Site and Architectural Review 07-12/Grand Terrace Town Square Master Development Plan (TSMDP), Master Development Sign Program 09-01, Site and Architectural Rev
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2013
Document Description
The TSMDP will develop, over time, in 5 Development Units that correspond to five development Phases. The TSMDP would permit the ultimate development of a 209,611 sf commercial and retail center on ~21 gross acres within the General Commercial designation of the Barton Road Specific Plan (BRSP). Master Development Sign Program 09-01 establishes a comprehensive sign program for the TSMDP. In addition to approval of the master planning documents, the applicant has filed SA 07-07, TPM 08-01, Sign Program - Development Unit 1 to construct Development Unit 1 of the TSMDP consisting 65,737 sf of commercial space, re-subdivision of 7 existing lots into 7 new lots, and the associated aign program for Development Unit 1.
Contact Information
Name
Sandra Molina
Agency Name
City of Grand Terrace Community & Economic Development
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Grand Terrace
Counties
San Bernardino
Cross Streets
Barton Road and Michigan Street
Zip
92313
Total Acres
21
Parcel #
1167-231-01 thru 13, and 1167-331-01 and 02
State Highways
I-215
Railways
BNSF
Airports
No
Schools
Grand Terrace ES, Terrace Hills MS
Waterways
Gage Canal
Township
2S
Range
4W
Section
5
Base
SBB&M
Notice of Determination
Approving Agency
City of Grand Terrace
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.