Municipal Water Well No. 42 (6096 Leonard Noell Drive)

3 Documents in Project

Summary

SCH Number
2008071005
Lead Agency
City of Tulare
Document Title
Municipal Water Well No. 42 (6096 Leonard Noell Drive)
Document Type
NOD - Notice of Determination
Received
Posted
11/3/2009
Present Land Use
M-1 (light manufacturing) Industrial
Document Description
The City of Tulare intends to construct and install a municipal water well at the Tulare Airport. The well depth of 700 feet and pump bowls set at the depth of 450 feet. The well will produce 1,200 gallons per minute. The well site will also have a 12,500 gallon Hydro Pneumatic tank. A 10 x 20 awning will cover equipment. Electrical panels for power supply, SCADA control, chlorine injection. Pump discharge piping and inline check valve, dispensing water into City water main Construction above ground will consist of concrete slab approximately 24 inches in height with a pump discharge for an additional 2-foot in height. There will be three electrical panels (2 foot wide by 4 foot long, and 5 feet in height) and one antenna 30 feet in height proposed for this project. City water well sites are normally fenced with landscaping along any street frontage. The site is zoned M-1 (light manufacturing).

Contact Information

Name
Mark S. Kielty
Agency Name
City of Tulare
Contact Types
Lead/Public Agency

Location

Cities
Tulare
Counties
Tulare
Cross Streets
Paige Avenue and Laspina Street
Zip
93274
Parcel #
191-100-019
State Highways
99
Township
20
Range
24
Section
25
Base
MDB&M

Notice of Determination

Approving Agency
City of Tulare
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.