Santa Ana Regional Interceptor Pipeline Reach IV-B
3 Documents in Project
Summary
SCH Number
2008071001
Lead Agency
Santa Ana Watershed Project Authority
(SAWPA)
Document Title
Santa Ana Regional Interceptor Pipeline Reach IV-B
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2008
Present Land Use
LU - Pipeline; Zoning - Corona; AG (A); County of Riverside: W-1; GP - Corona: Open Space, General Industrial; County of Riverside: OS-C;
Document Description
The proposed project consists of repairs to the existing pipeline and does not include any new structures or additional pipeline construction. The work efforts associated with the repairs of the pipeline system includes chemical grout repair of interior joints (the pipeline will require at least three repairs), clear and grub work to re-establish the 10-foot wide access road, clear and grub work to provide a 50-foot diameter turn around at manholes, and incidental related work. Localized excavation work around the manholes will be required to expose the manholes and to add riser pieces to the manholes. The manhole risers will be backfilled once the work is complete. No grading or excavation is required for the pipeline.
Contact Information
Name
Jeffrey Beehler
Agency Name
Santa Ana Watershed Project Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Corona
Counties
Riverside
Cross Streets
Butterfield Drive between Auto Center Drive and Clear Water Road
Zip
92880
Total Acres
1.5
Parcel #
101050009, 101150001, 101160003
State Highways
SR 91 & 71, Interstate 15
Railways
AT&S Railroad
Airports
Corona Municipal Airport
Waterways
Santa Ana River, Prado Dam
Township
3
Range
7
Section
20&21
Base
SBB&M
Notice of Determination
Approving Agency
Santa Ana Watershed Project Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.