Agreement 2007-0192-R4-Fair Oaks Mixed Used Project - Stormwater Outfall Repair
Summary
- SCH Number
- 2008069020
- Lead Agency
- City of Arroyo Grande
- Document Title
- Agreement 2007-0192-R4-Fair Oaks Mixed Used Project - Stormwater Outfall Repair
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/9/2008
- Document Description
- The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, Jason Blankenship, Arroyo View LLC, 191 South Oak Park Boulevard #10, Grover Beach, California 93433. The project consists of repair of an existing storm drain outfall. An energy dissipater, consisting of filter fabric and 800 cubic yards of riprap, will be installed at a storm drain outfall from a subdivision. The project site will be excavated with a shovel, filter fabric placed and a crane used to drop the riprap in place. Best management practices for erosion control, including a temporary erosion control and a sediment control system will be used to protect the stream during work activities.
- Contact Information
-
Julie Means
California Department of Fish and Game
Lead/Public Agency
Central Region 1234 East Shaw Avenue
Fresno, CA 93710
Phone : 559 243-4014 x 240
Location
- Counties
- San Luis Obispo
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- City of Arroyo Grande 214 East Branch Street Arroyo Grande, CA 93420
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.