Finkle Lot Line Adjustment and Final Map Subdivision

2 Documents in Project

Summary

SCH Number
2008062103
Lead Agency
Humboldt County
Document Title
Finkle Lot Line Adjustment and Final Map Subdivision
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Residential Two Family with a Greenway and Open Space combining zone (R-2*/GO); Residential, Multiple Family (RM)
Document Description
A Lot Line Adjustment (LLA) between two (2) separate legal parcels known as APNs 18-062-04, -09. The LLA will result in Parcel A which will be +/- 7,000 square feet (net) and is developed with a 4-plex and Parcel B which will be +/- 1.34 acres. Parcel B is developed with a duplex. Parcel B will then be divided into five (5) parcels ranging in size from 5,520 square feet (net) - +/- 35,300 square feet (net). The area is served by community water and sewer. The project also includes an exception for reduced road width on Jeffrey Lane (south side of project) and the new unnamed access along the northerly property line serving Parcel A and Lots 2 and 3.

Contact Information

Name
Trevor Estlow
Agency Name
Humboldt County Community Development Services Department
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
V Street
Zip
95503
Total Acres
1.5
Parcel #
018-062-04 and -09
State Highways
101
Airports
Murray Field
Schools
Cutten Elementary
Waterways
Martin Slough
Township
5N
Range
1W
Section
35
Base
HB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Eureka Region 1 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 1 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, North Coast Region 1 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Resources Agency
Development Types
Residential (Units 10, Acres 1.5)
Local Actions
Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Biological Resources, Drainage/Absorption, Geology/Soils, Sewer Capacity, Transportation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print