Lake or Streambed Alteration Agreement No. R1-08-0230 Bassett Diversion Fish Passage Project

3 Documents in Project

Summary

SCH Number
2008062093
Lead Agency
Western Shasta Resource Conservation District
Document Title
Lake or Streambed Alteration Agreement No. R1-08-0230 Bassett Diversion Fish Passage Project
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2008
Present Land Use
Agricultural Land / EA-AP Exclusive Agriculture - Agricultural Preserve / AC Agricultural Cropland
Document Description
The project will consist of re-construction an existing side channel to allow fish passage around the south side of the Bassett Ditch diversion dam. The side channel will be improved by building up the existing berm between the main creek channel and the side channel and cutting through the bank located at the south end of the dam so that the side channel can rejoin the main creek channel upstream from the dam. The side channel that will be re-designed is approximately 160 feet in length and average 10 feet wide.

Contact Information

Name
Mary Mitchell
Agency Name
Western Shasta Resource Conservation District
Contact Types
Lead/Public Agency

Location

Counties
Shasta
Cross Streets
Whitmore Road and Buggy Road
Zip
96062
Total Acres
<1
Parcel #
099-130-015 & 099-130-016
Waterways
Cow Creek & Old Cow Creek
Township
32N
Range
1W
Section
20
Base
MDB&M
Other Location Info
City/Nearest Community: Millville

Notice of Determination

Approving Agency
Western Shasta Resource Conservation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print