Bidwell Canyon Stage 3 Boat Ramp Improvement Project

5 Documents in Project

Summary

SCH Number
2008062085
Lead Agency
California Department of Water Resources (DWR)
Document Title
Bidwell Canyon Stage 3 Boat Ramp Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/3/2008
Present Land Use
Within Lake Oroville, part of State Recreation Area
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2008-0177-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, California Department of Water Resources. The project involves improvements to the existing Bidwell Canyon boat ramp to include a low-water level boat launch facility from elevations 750 to 640 feet. The project will include construction of an additional three-lane boat ramp at elevations 720 to 640 feet. In addition, a parking lot will be provided to include a 46 car/trailer spaces and eight vehicles only spaces at elevation 720 feet. An access road will be graded from the existing Bidwell Canyon Stage 2 Boat Ramp. All new construction will use concrete. Grading and placement of compacted aggregate road base will precede concrete placement. All work will be done in the dry after lake levels have receded. All work will be dependent upon reservoir water levels.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte
Cross Streets
Bidwell Canyon Road, Arroyo Drive, Kelly Ridge Road, Hwy 162
Zip
95966
Total Acres
4.7
State Highways
Hwy 162
Waterways
Feather River / Lake Oroville
Township
20N
Range
5E
Section
31

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print