Sutter Bypass East Borrow Canal Water Control Structures Project

6 Documents in Project

Summary

SCH Number
2008062058
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Sutter Bypass East Borrow Canal Water Control Structures Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2008
Present Land Use
Parcels owned by the Central Valley Flood Protection Board, Zoning: Agriculture, Open Space.

Document Description
Sutter Bypass East Borrow Canal Water Control Structures Project proposes to replace existing structures (Weir No. 2 and Willow Slough Weir) to improve fish passage through the Sutter Bypass. At the Weir No. 2, DWR proposes to remove the existing weir and fish ladder and replace them with new structures that are more effective and safer to operate. At the Willow Slough Weir, DWR proposes to remove the existing fish ladder and culverts and replace them with new structures which are designed to provide better flow control from the EBC into Willow Slough, and provide effective fish passage between the two waterways.

Contact Information
Gary L. Hobgood
Department of Fish and Game
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

Phone : (916) 983-6920

Location

Cities
Yuba City
Counties
Sutter
Cross Streets
Willow Slough Weir: Sacramento Avenue/ Kirkville Road; Weir No. 2: West end McClatchy Road
Zip
95993
Total Acres
7.85
Parcel #
29-210-008, 29-210-017, 13-340-046
State Highways
99
Waterways
Sutter Bypass, East Borrow Canal, Willow Slough

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
www.watershedrestoration.water.ca.gov/fishpassage/projects/lowerbutte.cfm

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes