California Health Care Facility Stockton

6 Documents in Project

Summary

SCH Number
2008062056
Lead Agency
California Prison Healthcare Receivership Corporation (CPR)
Document Title
California Health Care Facility Stockton
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2013
Document Description
The California Department of Corrections and Rehabilitation (CDCR), in the cooperation with the California Prison Health Care Receivership Corporation (CPR) and the federal Receiver, propose to add up to 96 PWC beds to the previously approved CHCF Stockton project. Additionally, since the approval of the CHCF project, the design of the housing units reduced the overall bed being constructed from 1,734 to 1,722 beds. The addition of the 96 beds will increase the total beds constructed at the CHCF project to 1,818 beds (a net increase of 84 beds to the number evaluated in the 2009 EIR). These modifications require no adjustment to internal floor space utilization and would be accommodated by the existing site plan and building design as analyzed in the 2009 EIR.

Contact Information

Name
Nancy MacKenzie
Agency Name
California Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Arch Road and Austin Road
Zip
95213-9004
Total Acres
144.2
Parcel #
181-100-07,-11,181-150-02,-11,-12
State Highways
SR 99
Railways
Burl.North./Santa Fe
Airports
Stockton Municipal
Schools
O.H. Close School
Waterways
Littlejohns Creek and Weber Slough
Township
1N
Range
7E
Section
27&34
Base
MDB&M

Notice of Determination

Approving Agency
California Prison Health Care Receivership
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print