Petaluma River (Corona Reach) Channel Maintenance Project
3 Documents in Project
Summary
SCH Number
2008062053
Lead Agency
Southern Sonoma County Resource Conservation District
Document Title
Petaluma River (Corona Reach) Channel Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2008
Present Land Use
Sonoma County General Plan, 1998: General Commercial; Diverse Agriculture. City of Petaluma General Plan, 1991: Special Commercial; Thoroughfare Commercial; Special Industrial; Urban Diversified; Floodway/Floodplain.
Document Description
The Southern Sonoma County Resource Conservation District (SSCRCD) is proposing a channel maintenance and revegetation project on the Corona Reach of the Petaluma River within portions of the City of Petaluma and unincorporated Sonoma County. The purpose of the project is to help alleviate flooding and reduce channel erosion that contributes sediment to the Petaluma River, with the goal of managing the river channel for an optimum balance between flood conveyance and healthy riverine ecology. The proposed project is funded through Sonoma County Water Agency Zone 2A tax dollars designated specifically for flood control and channel maintenance projects within the drainage zone.
Contact Information
Name
Jason Sweeney
Agency Name
Southern Sonoma County Resource Conservation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Petaluma
Counties
Sonoma
Cross Streets
City-wide
Zip
90277,278
Parcel #
Various
State Highways
Highway 101
Railways
Northwestern Pacific RR
Schools
Cinnabar ES, St. Vincent HS, Mary Collins at Cherry Valley
Waterways
Petaluma River
Township
5N
Range
7W
Base
MDB
Notice of Determination
Approving Agency
Southern Sonoma County Resource Conservation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.