LaTour Demonstration State Forest Fuelbreak/Flat Top Biomass (SNC 578)

3 Documents in Project

Summary

SCH Number
2008062009
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
LaTour Demonstration State Forest Fuelbreak/Flat Top Biomass (SNC 578)
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2012
Present Land Use
Forest Land: Timber Production Zone (TPZ)
Document Description
The California Department of Forestry and Fire Protection (Cal Fire) has requested $90,000 from the Sierra Nevada Conservancy's Proposition 84 Healthy Forests Grant Program to fund the creation of a 400-foot wide fuel break, 200 feet on each side, cover 199 acres along a series of four road segments located on LaTour Demonstration State Forest (LDSF). In addition, a 104-acre biomass thinning operation is planned on Table Top Mountain. In total, the firebreak/Flat Top Biomass operation covers 303 acres on LDSF. The project includes harvesting of small trees 3 to 12 inches in diameter at breast height (DBH) by means of mechanical sheers, skidding and chipping, then transporting chips to a co-generation plant in Redding or Burney.

Contact Information

Name
Jim Branham
Agency Name
Sierra Nevada Conservancy
Contact Types
Lead/Public Agency

Location

Counties
Shasta
Cross Streets
Highway 44, Whitmore, Tamarack, and Bateman Roads
Total Acres
9,033
State Highways
44
Waterways
Old Cow Creek, South Cow Creek, NF Battle Creek, SF Bear Creek
Township
32,33N
Range
2, 3E
Base
MDB&M
Other Location Info
City/Nearest Community: Whitmore

Notice of Determination

Approving Agency
Sierra Nevada Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print