Remedial Action Plan, Proposed Central Region High School #16, Site 3a

2 Documents in Project

Summary

SCH Number
2008061138
Lead Agency
Department of Toxic Substances Control
Document Title
Remedial Action Plan, Proposed Central Region High School #16, Site 3a
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2008
Present Land Use
M1-1 (Light Manufacturing), C2-1VL (General Commercial), and R2-1 (Low-Medium Residential).
Document Description
The project involves approval of a Remedial Action Plan (RAP) by the Department of Toxic Substances Control (DTSC) for the proposed Central Region High School #16 - Site 3a (Site) pursuant to Health and Safety Code chapter 6.8. The RAP focuses on (1) excavation and off-site disposal of soils impacted with volatile organic compounds (VOCs), methane, semi-VOCs, polycyclic aromatic hydrocarbons (PAHs). total petroleum hydrocarbons (TPHs), organochlorine pesticides (OCPs), and heavy metals; and (2) installation and operation of a soil vapor extraction (SVE) system for residual VOCs and methane in soil vapor onsite. After completion of the planned excavations, cleanup confirmation sampling and site restoration will be conducted. If necessary, additional soil volume will be excavated, to ensure all impacted soils containing the identified chemical of concerns (COCs) at concentrations of the corresponding cleanup levels or above have been properly removed.

Contact Information

Name
Juan C. Osornio
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Avalon Boulevard and East 54th Street
Zip
90011
Total Acres
13.24
Parcel #
5101-001-900, 5101-001-002, 5109-026-03 to 5109-026-031
State Highways
110
Schools
Los Angeles Academy Middle School
Township
2S
Range
13W
Section
17

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print