Elysian Reservoir Water Quality Improvement Project

6 Documents in Project

Summary

SCH Number
2008061109
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Elysian Reservoir Water Quality Improvement Project
Document Type
NOD - Notice of Determination
Received

Document Description
SWRCB is a Responsible Agency for this project. The SWRCB Safe Drinking Water State Revolving Fund Program is providing funds for the project. The LADWP propose sot replace the Elysian Reservoir with a new buried concrete-covered reservoir. Other than manholes, hatches providing access to the interior of the buried reservoir, above ground vent structures, above ground electrical cabinets, and similar appurtenant facilities, water storage and distribution facilities would be essentially concealed underground after completion of construction. However, a paved road would still be required around the perimeter of the buried reservoir to provide vehicle access for maintenance and operations of the reservoir. This road would also serve as a maintenance access road for the park facilities, but would not be open to private vehicles.

Contact Information
M. Cora Siacunco
SWRCB
1001 I Street, 17th Floor
Sacramento, CA 95814

213-367-4185

Location

Coordinates
34°4'41.2"N 118°13'49.5"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Grand View Drive & Park Row Drive
Zip
90012
Total Acres
14
Parcel #
5415004901
State Highways
SR-110, I-5
Schools
Solano ES
Waterways
Los Angeles River

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1001 I Street, 17th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes