Elysian Reservoir Water Quality Improvement Project

6 Documents in Project

Summary

SCH Number
2008061109
Lead Agency
City of Los Angeles
Document Title
Elysian Reservoir Water Quality Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2012
Present Land Use
Present Land Use: Reservoir Zoning: [Q]OS-1XL (open Space); General Plan Designation: Open Space
Document Description
To help ensure the quality, reliability, and stability of the City of Los Angeles drinking water supply and to ensure compliance with updated United States Environmental Protection Agency (EPA) water quality standards, the City of Los Angeles Department of Water and Power proposes to install and approximately 325,00 square foot flexible membrane floating cover over the entire water surface and anchored to the edge of the reservoir basin above the top of water elevation (the floating cover alternative evaluated in the Environmental Impact Report.) The cover would be a minimum of 45-mil thick and a maximum of 60-mil thick polypropylene of hypalon material. Although the reservoir liner and appurtenant facilities would be removed and replaced, the reservoir would retain essentially its existing shape and volume (approximately 55 MG). In addition, a new 54-inch diameter underground inlet line connecting the reservoir to the existing Riverside Trunk Line would also be constructed to replace the existing nearly 67-year old 36-inch diameter inlet line.

Contact Information

Name
Julie Van Wagner
Agency Name
City of Los Angeles, Department of Water and Power
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Grand View Drive & Park Row Drive
Zip
90012
Total Acres
14
Parcel #
5415004901
State Highways
SR-110, I-5
Schools
Solano ES
Waterways
Los Angeles River

Notice of Determination

Approving Agency
City of Los Angeles Board of Water and Power Commissioners
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print