Water Right Permit Application A031174B01 and the Burris Basin, Lincoln Basin Reconfiguration and Five Coves Pipeline Project

4 Documents in Project

Summary

SCH Number
2008061079
Lead Agency
Orange County Water District
Document Title
Water Right Permit Application A031174B01 and the Burris Basin, Lincoln Basin Reconfiguration and Five Coves Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2025
Document Description
The Project proposes the reconfiguration of existing groundwater recharge basins, construction of transfer well and construction of a transfer pipeline system.

Contact Information

Name
Matthew McCarthy
Agency Name
State Water Resources Control Board, Division of Water Rights
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Name
Adam Hutchinson
Agency Name
Orange County Water District
Job Title
Recharge Planning Manager
Contact Types
Lead/Public Agency

Location

Counties
Orange, Riverside
Regions
Southern California
Waterways
Santa Ana River
Township
3S, 4S
Range
7W, 9W
Base
SBBM
Other Location Info
The project is located within: (1) Prado Basin, a mostly undeveloped flood control basin located behind Prado Dam on the Santa Ana River near the cities of Yorba Linda, Norco, and Corona; (2) along the Santa Ana River; (3) within the service area of the Orange County Water District in Orange and Riverside counties; and (4) between Ball Road and Kraemer Avenue, west of the Santa Ana River, City of Anaheim.

Notice of Determination

Approving Agency
State Water Resources Control Board, Division of Water Rights
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Orange, Riverside
Final Environmental Document Available at
Orange County Water District Headquarters, 18700 Ward St, Fountain Valley, CA 92708

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print