Don Chapin Batch Plant CUP/Industrial Annexation Project

2 Documents in Project

Summary

SCH Number
2008061022
Lead Agency
City of Greenfield
Document Title
Don Chapin Batch Plant CUP/Industrial Annexation Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Mostly agricultural uses, low density residential in the northwest corner of the project area, and a County Public Works storage facility / City of Greenfield: Light Industrial (I-L) and Heavy Industrial (I-H); County of Monterey: Farmlands / County of Monterey: Farmlands, 40 acre minimum (F-40)
Document Description
NOTE: Review Per Lead The project consists of the annexation of approximately 68 acres of property into the existing City limits, and the near-term development of a cement batch plant on approximately 14.7 acres, requiring a conditional use permit (CUP). The property is designated for light and heavy industrial uses in the Greenfield General Plan, and the applicant is requesting pre-zoning consistent with that designation.

Contact Information

Name
Brent Slama
Agency Name
City of Greenfield
Contact Types
Lead/Public Agency

Location

Cities
Greenfield
Counties
Monterey
Cross Streets
Elm Street and 2nd/3rd Streets
Parcel #
109-092-002 through 012
State Highways
101
Railways
Union Pacific
Schools
Greenfield HS, Vista Verde MS, Oak Avenue ES

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Major Industrial Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency
Development Types
Industrial (Acres 14.7, Employees 12), Other (Cement Batch Plant)
Local Actions
Site Plan, Prezone, Use Permit, Annexation
Project Issues
Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print